Working stations
  • GAW working stations
  • The Working Station at the Coater supplies the Starch or Coating Colour to the Coating Head

 

  • Application:
  • Filtration  (Removing of mineral contamination)
  • Working Tank ( Working Volume = 60 sec retention time)
  • Total Volume must contain Starch or Coating Color from the Coating Head and Piping System)
  • Piping Engineering

 

  • Working stations